Polk County Projects Catalog
Garden Grove
Project Type
Stormwater Pond
Status
Complete
Description
The objective of this project was to construct an innovative regional stormwater treatment pond for stormwater runoff. The treatment consists of a wet detention stormwater treatment system planted with beneficial native aquatic plants. This provides a settling area for the removed sediments flowing in from neighboring streets and allowing the plants to provide biological treatment of the stormwater.
Completion Date
January 1, 2002
Download PDF
Print
Click Map for a Large, Interactive Version
Site Photo(s)
Pollution Reduction Estimates
ProjectID
WBID
Load Reductions
(lbs.)
TN
(lbs/yr)
TP
(lbs/yr)
TSS
(lbs/yr)
BOD
Fecal coliform
(%)
146
PEACE CREEK DRAINAGE CANAL (1539)
Site Location
Copyright © 2001 - 2025
USF Water Institute
,
School of Geosciences
,
College of Arts and Sciences
,
University of South Florida