Polk County Projects Catalog
HWY 27 Lake Hamilton BAM Retrofit
Project Type
Water Quality Enhancement
Status
Construction Pending
Description
The purpose of this project was to partner with FDOT to implement a swale ditch retrofit with Bioadsorption Activated Media (BAM) to help reduce nutrient loading into Lake Hamilton. The project installed BAM in the bottom of three existing ditches along US Highway 27 to achieve water quality improvements. This project complemented the County's Alternative Restoration Plan with FDEP.
Completion Date
June 1, 2025
Download PDF
Print
Click Map for a Large, Interactive Version
Site Photo(s)
Pollution Reduction Estimates
ProjectID
WBID
Load Reductions
(lbs.)
TN
(lbs/yr)
TP
(lbs/yr)
TSS
(lbs/yr)
BOD
Fecal coliform
(%)
140
LAKE HAMILTON OUTLET (1504)
40.8
3.9
Site Location
Copyright © 2001 - 2025
USF Water Institute
,
School of Geosciences
,
College of Arts and Sciences
,
University of South Florida