Polk County Projects Catalog
Berkley Pond BAM Retrofit
Project Type
Water Quality Enhancement
Status
Construction Pending
Description
The purpose of this project was to partner with FDOT to implement a retention pond retrofit with Bioadsorption Activated Media (BAM) to help reduce nutrient loading into Lake Lena. The project installed a 24-inch layer BAM in the existing retention pond. This project satisfied NPDES requirements identified in the County's Lake Lena Supplemental Stormwater Management Plan.
Completion Date
June 1, 2025
Download PDF
Print
Click Map for a Large, Interactive Version
Site Photo(s)
Pollution Reduction Estimates
ProjectID
WBID
Load Reductions
(lbs.)
TN
(lbs/yr)
TP
(lbs/yr)
TSS
(lbs/yr)
BOD
Fecal coliform
(%)
139
LAKE LENA RUN (1501A)
96.2
40.4
Site Location